- a hundred-odd machines — 5-axis (20+), 3-axis (50+), 4-axis (20+), 25+ lathes, 7+ grinders across 6,800 m².
- MOQ 1 piece, with 3 / 7 / 30-day lead-time tiers set by process steps, not by a blanket promise. ±0.003 mm CNC milling, ±0.002 mm CNC turning; ±0.002 mm grinding, verified on Hexagon CMMs.
- IATF 16949 automotive-grade process control applied to every part, not just automotive ones.
What does "capacity" mean for a machined parts order?
For you, capacity is the difference between a quote date that holds and one that slips the moment demand rises. A supplier with one or two relevant machines can produce your part, but your order queues behind every other job on those machines. Real capacity is depth — enough of the right machines that your work can start when promised.
This floor holds 20+ 5-axis centers inside a fleet of more than 100 machines, with 50+ 3-axis centers, 20+ 4-axis centers, 25+ lathes, and 7+ grinders. That depth means a complex 5-axis part does not wait behind a backlog, and a prototype can graduate to production on the same floor without a capacity gap. It also means the simple parts and the complex parts run in separate lanes, so neither queue delays the other.
Which parts benefit most from 5-axis manufacture?
5-axis manufacture is not a label you pay for; it is a process you choose when the geometry demands it. The parts that benefit are the ones where features on several faces must be concentric to one datum, or where a surface curves in more than one plane.
- Impellers and blisks — twisted blades that only a tilting tool can reach.
- Aerospace and structural brackets — thin walls, pockets, and flanges on multiple faces that must line up.
- Manifolds and valve bodies — intersecting passages at compound angles.
- Orthopedic implants — organic contoured surfaces in one piece.
- Semiconductor and vacuum components — flatness-critical housings with ports on several faces that share one datum.
- Robotic joints and end-effectors — compact bodies with bearing bores and mounting faces that must stay concentric.
If your part is mostly flat with holes on one side, 3-axis is the cheaper route and we will say so. The value of an honest manufacturer is that it routes your part to the process it needs, not the one with the higher hourly rate.
What materials can this manufacturer run?
You are not limited to one alloy family. We machine the materials buyers specify on drawings, and we verify every incoming lot by XRF against its mill certificate before it reaches a machine.
| Material family | Grades run | Notes for buyers |
|---|---|---|
| Aluminum | 6061, 6063, 6082, 7075, 2014 | Most common prototype and production choice; anodizes well |
| Stainless steel | 303, 304, 316, 316L, 17-4PH | 303 free-machining, 316L corrosion, 17-4PH strength + aging |
| Carbon / alloy steel | 1018, 1045, 4140, 4340, 12L14 | Carburizing or nitriding for wear parts |
| Brass / copper | C360, H62, C110 | Electrical and thermal conductivity |
| Titanium | TA2, TC4 (Grade 2 / 5) | Stress-relief above 500 °C is outsourced to a qualified partner |
| Plastics | ABS, POM (Delrin), nylon, PTFE, PEEK | Non-metal prototypes and insulators |
The material table is also a lead-time table in disguise. Aluminum machines fastest and anchors the short tier; stainless and alloy steel cut slower and wear tools faster; titanium is slowest of the common metals and needs light cuts. The alloy is chosen for function first — strength, corrosion, weight, or conductivity — but the schedule is the honest second consequence, and you should hear both before committing to a grade.
How do tolerances relate to what you actually receive?

A tolerance on paper means nothing without the measurement behind it. Our tolerances are tied to the process, and critical dimensions are checked on a CMM rather than taken on faith.
| Process | Held tolerance | Typical use |
|---|---|---|
| CNC milling | ±0.003 mm | Housings, brackets, prismatic parts |
| CNC turning | ±0.002 mm | Shafts, pins, bushings, round parts |
| Precision grinding | ±0.002 mm | Bearing seats, roundness-critical surfaces |
These are held to process capability, not a best-case claim. On a representative length characteristic (76.1–76.5 mm) the SPC record shows Cpk = 1.851 (one characteristic on one part, not a blanket capability claim) against an initial-study target of Ppk ≥ 1.67. If a print calls out a dimension we cannot reliably hold, it is flagged during the design review — before cutting, not after.
Read the tolerance band before you read the index. Cpk is a ratio of the tolerance band to the process spread, not an absolute measure of accuracy. The figure above was recorded on a length characteristic with a 0.4 mm band (76.1–76.5 mm) — wide by design. Hold the same process spread against a ±0.005 mm feature and it fails outright. Ask for the band, the subgroup count and the sampling window on every capability number a supplier quotes.
Surface finish rides alongside tolerance and carries its own schedule cost. A normal machined surface lands around Ra 3.2 µm; a fine milled or turned finish reaches Ra 1.6 µm; Ra 0.8 µm or finer usually means grinding or polishing, which is a second operation with its own queue. The same discipline applies as with tolerance: specify the finish the function needs, and no finer, because every finer step is time the part does not otherwise require.
How does the MOQ of 1 piece change how you buy?
Most manufacturers set a minimum to protect their setup cost; that minimum is often where your risk begins. Our MOQ is 1 piece, which changes the arithmetic of validation. You can order a single prototype, test it, iterate the design, and only then commit to volume — without paying for parts you do not need yet.
This matters most for complex 5-axis parts, where the tooling and programming investment is real. A 1-piece MOQ lets you prove the geometry and the tolerance before the production order, so the risk of a bad batch is absorbed at the prototype stage, not the volume stage.
The ramp itself is where the MOQ pays off a second time. Because the prototype and the production run happen on the same floor, on the same machine families, the proving work done on the one-off carries into the volume order — same program, same datums, same inspection plan. You do not re-qualify a part when the quantity changes; the part graduates from one piece to a run without a change of supplier or process.
How is each part traced back to its raw material?
For automotive and regulated buyers, traceability is not optional. The MES/ERP system records the full chain on every lot: raw material source and usage, process parameters, machine data, production batch, machining time, operator, and inspection results. If a non-conformance ever surfaces, we can identify the exact lot, machine, and operator, and isolate the impact instead of guessing.
Incoming material is checked by XRF against the mill certificate so mixed lots are caught at the door. This is the same discipline an IATF 16949 audit looks for, and it runs on every job.
Which secondary operations can be bundled?
Parts ship finished, not as machined blanks. Secondary operations run in parallel or through qualified partners so you get one accountable supplier.
- Surface finishing: standard and hard anodizing, zinc / nickel / silver / gold / chrome plating, powder coating, painting, brushing, mirror polishing.
- Heat treatment: vacuum, bright, carburizing, nitriding, and stress-relief aging. In-house ovens reach 500 °C; titanium stress relief above that is outsourced to a qualified partner.
- Deburring, tapping, laser marking, assembly: included as the print requires.
Which design choices make a part easier to machine?
Some part-level decisions add steps long before the part reaches a machine, and they are the kind of thing a DFM review catches before quoting. The ones that most often add time are the small ones on the drawing: thread depth, wall thickness, and feature placement.
- Threaded holes: a thread specified deeper than it needs to be takes longer to cut and harder to tap cleanly; a blind threaded hole needs a bottoming tap or extra care.
- Thin walls and webs: below roughly 0.8 mm in metals, walls deflect under the cutter, forcing lighter passes and sometimes a slower finishing strategy to hold size.
- Features close to the edge: a hole too close to a wall can break through or distort, so the machinist compensates with slower feeds and extra checks.
- Plating and anodizing masking: if a finish must not touch a thread or a datum face, that masking is its own step — cheap on the drawing, but a step in the schedule.
None of these change what the part does; each one changes how many careful operations it takes to make. If you flag these in the design phase — rather than after the first article — you are cutting lead time without cutting a single feature.
How does the part's function choose its material?
Material selection runs the other direction from how it is usually framed. It starts with what the part must do — carry load, resist corrosion, shed heat, or conduct — and only then reaches the manufacturing consequences of the grade. A structural bracket that needs strength-to-weight points to 7075; a marine fitting points to 316 stainless; a high-temperature aerospace part points to titanium. The function is the gate, and the material is the answer that falls out.
Once the function has chosen the alloy, the lead-time and cost consequences follow and should be stated plainly. 7075 machines nearly as fast as 6061; 316 cuts slower than free-machining 303; titanium is the slowest of the common metals and adds a stress-relief consideration above 500 °C. The point is not to let lead time override function — it never should — but to know the schedule cost of the material the function demands, so the plan accounts for it from the first drawing rather than discovering it at the quote.
What this shop actually runs
We machine every part in our own 6,800 m² plant in Dongguan, China, on 100+ CNC machines with 100+ staff. The machine list by category:
- 5-axis machining centres (10+) - Mazak VARIAXIS I-600 (510/910/510 mm travel, 12,000 rpm, 22 kW, 71.6 N·m, 30-tool BT40) and Mazak INTEGREX I-250H S (B-axis 0.0001°, 24 kW, 124 N·m, 38-tool HSK-A63). Suited to compound-angle parts, single-setup multi-face prismatic work, and aerospace fittings where datum transfer loss is unacceptable.
- 3-axis / 4-axis machining centres (50+) - Brother SPEEDIO S500Z2N / S700Z2N (10,000 rpm, 14/21-tool ATC, 0.7 s tool-to-tool, Z-axis 2.2 G) and Mazak VCE-430A L / VCE-570C L (10,000 rpm, 118 N·m, 24-tool ATC). Suited to prismatic parts, plates, brackets, housings.
- Swiss-type turning centres (10+) - Citizen Cincom A20-3F7 (Φ20 mm, 10,000 rpm), TSUGAMI B0206-III / B0205-III (Φ20 mm, 0.1 µm), STAR SR-32JII / SR-32J Type N (Φ32 mm, 8,000 rpm). Suited to long, slender rotational parts at ±0.002 mm.
- CNC turning centres (20+) - HEADMAN T70M/1250 (720 mm swing, 117 mm bore, 3,000 rpm, BMT75 12-station turret). Suited to shafts, bushings, flanges up to ±0.002 mm.
- Wire EDM (5+) - Sodick AQ535L (550/350/300 mm travel, ±20° taper, 800 kg workpiece). Suited to hardened tool steel, internal splines, sharp internal corners that milling cannot reach.
- Inspection: Hexagon CMM + 20+ gauges - Hexagon CMM for coordinate measurement, plus vision system, profilometer, hardness tester, coating thickness gauge, XRF for material verification. The 10:1 rule (gauge 10x more accurate than the band) is applied to every feature.
- Machine highlights - VARIAXIS I-600: one-setup multi-face 5-axis + MAZA-CHECK auto-calibration; INTEGREX I-250H S: DONE-IN-ONE mill-turn, B-axis 0.0001° + Ai thermal shield; SPEEDIO S500Z2N / S700Z2N: Z-axis 2.2 G + 0.7 s ATC; Swiss-type: guide-bush switchable + 0.1 µm resolution.
Tolerance: ±0.003 mm CNC milling / ±0.002 mm CNC turning / ±0.002 mm grinding and wire EDM. Capability: Ppk >= 1.67 initial on key characteristics, Cpk >= 1.33 ongoing.
Certificates: ISO 9001:2015 (116024/A/0001/UK/En), IATF 16949:2016 (131941/A/0001/SM/En, with design clause 8.3 excluded, stated openly) and ISO 14001:2015 (116024/B/0001/UK/En), issued to Dongguan Zhuohang Ltd, registration 91441900MA4UWT6X39, founded 2005.
Where we ship: Austria, Belgium, the Czech Republic, Denmark, France, Germany, Greece, Hungary, Ireland, Italy, the Netherlands, Spain, Sweden and the United Kingdom in Europe; Brazil, Canada, Mexico and the United States in the Americas; China, Israel, Japan, Singapore and Sri Lanka in Asia; Australia and New Zealand in Oceania; and South Africa in Africa — plus other countries and regions worldwide, shipped from our base in Dongguan, China.
Contact: Felipe Iglesias, [email protected], +86 13126536955.
Ready to get your 5-axis machined parts quoted?
Send your drawing to [email protected] or call +86 13126536955 for a DFM review and a lead-time-accurate quote.
Frequently Asked Questions
What is your minimum order quantity for machined parts?
The MOQ is 1 piece. Prototype and single-part orders run on the same floor as production, so you can validate a complex part before committing to volume without switching suppliers.
What drives the lead time on a machined part?
Lead time is set by the number of process steps, the material, and any finishing. Simple parts ship in about 3 days, standard work in about 7, and complex or finished parts in about 30.
Which materials do you machine?
Aluminum, stainless steel, carbon and alloy steel, brass, copper, titanium, and magnesium, plus engineering plastics such as PEEK and POM. Every incoming lot is XRF-checked against its mill certificate.
What tolerances can you hold?
In short, ±0.003 mm on CNC milling, ±0.002 mm on CNC turning, and ±0.002 mm for precision grinding. Critical dimensions are verified on Hexagon CMMs with process capability Ppk ≥ 1.67 at the initial study on key characteristics and Cpk ≥ 1.33 on general characteristics.
Can you bundle finishing and heat treatment?
Yes — anodizing, plating, powder coating, painting, brushing, and polishing can be bundled, along with heat treatment. In-house ovens reach 500 °C; titanium stress relief above that is outsourced.
Do you provide inspection reports and material certs?
Yes. Incoming material is verified by XRF against the mill certificate, and CMM inspection reports and SPC charts ship with your parts as documented evidence.
How do I get a quote?
Email your STEP, IGES, or 2D drawing to [email protected] with material, tolerances, quantity, and target date. A design-for-manufacturing review and quote return with a realistic date.
Which material is fastest to machine for my part?
In short, Aluminum alloys such as 6061-T6 machine fastest of the common metals, which is why they anchor short-tier prototyping. Stainless and alloy steel cut slower, and titanium is slowest.
How do I know my material will match the certificate?
Every incoming lot is XRF-checked against its mill certificate before it reaches a machine, so a mixed or mislabeled alloy is caught at the door. The inspection report and material certificate ship with the parts as documented evidence.
What is the difference between a prototype and a production part here?
Mostly quantity. A one-off prototype and a production run happen on the same floor with the same programs and inspection plan, so the validation done on the prototype carries into the run instead of being repeated on new equipment.
Continue reading: 5 Axis CNC Milling Manufacturer · 3 Axis CNC Milling · 4 Axis CNC Milling
Standards referenced on this page
- ASTM B211/B211M-19 — Standard Specification for Aluminum-Alloy Rolled or Cold Finished Bar, Rod, and Wire
- ASTM A276/A276M-17 — Standard Specification for Stainless Steel Bars and Shapes
- ISO 9001 — Quality management systems — Requirements
